Horizontal Solar Shading – New Office Space, Cannock

Horizontal Solar Shading – New Office Space, Cannock

The images below show the latest work NLC have completed at a brand new office development in Cannock. This is the fourth installation on this project, directly beneath the original installation. NLC were asked to design the shading so that it would cover the entrance / doorway which meant it had to be fixed to the curtain walling system. Clear plastic sheets were bolted to the top of the two panels directly above the doors to prevent rainwater dropping from the panels onto visitors and staff as they enter the building. Stainless steel cantilever arms have been used for additional support.

Vertical Shading Fins – St Georges School, Gravesend

Vertical NLC-SOL300-E Aluminium Brise Soleil – St Georges School, Gravesend

Nationwide Louvres recently completed the third phase of Brise Soleil installation at St Georges School in Gravesend. The third phase of installation included two  complete sections of Brise Soleil to the brand new extension of the school and also an additional section of Brise soleil to one of the existing runs. New sections of Brise Soleil were manufactured and installed exactly as previous phase, horizontal box section rails were fixed to the face of the rendered wall via small support stubs to the rear. 300mm elliptical blades were then secured to the front face of the box section into fixed angle brackets set at 0 degrees.