NLC completed a project at the Royal Observatory Greenwich. Various Louvres were supplied and installed using both 50mm and 75mm blades. NLC Louvre panels were installed around the site to both the existing and to the new building. NLC designed access doors within the panels as required and overcome various problems to conclude the installation. Only high quality aluminium is used on NLC louvre products.